mVerve Let's talk Let's talk
Enterprise Modernization

Replace the legacy. Don't rewrite it. Keep everything running.

We modernise old systems one piece at a time. Your business keeps running, your team stays uninterrupted, and your costs stay under control throughout. No downtime. No big rewrite weekend. No nine-figure invoice.

Three truths we lead with
Rewriting everything at once is the most expensive way to fail.

Eighteen months of work that produces nothing until the end, a go-live weekend nobody sleeps through, and a system that still does not do what you needed. We have seen it. We build around it from the start.

An old system is a liability, not just an inconvenience.

Every month on an ageing system compounds the cost. Security gaps widen, engineers stop wanting to touch it, and the new tools your business needs cannot connect to it. Staying put is not the safe option.

Modernisation is a business problem, not just an engineering one.

Without a clear business outcome driving the work, you end up moving code from one place to another and calling it done. We start with what your organisation needs to achieve, then work backwards from there.

How it works, drawn

How a piece-by-piece migration works.

MONTH 0 MONTH 4 MONTH 8 MONTH 12 MONTH 14 LEGACY CORE · MONOLITHIC SAP retired API · INTEGRATION LAYER Order Mgmt SHIPPED · M4 Pricing SHIPPED · M6 Invoicing SHIPPED · M9 Revenue SHIPPED · M12 LEGACY EXTRACTED SERVICE INTEGRATION LAYER
Fig. 01 · Piece-by-piece migration · 14-month cadence
How we approach it

Four moves we make on every project.

Step by step
Two parts at a time.

We move two parts of your system at a time, with nothing going offline during each switch. You see working software every two weeks. Not a finished result delivered at the end of a long project.

Clean separation
Old and new run side by side.

We put a clean connection point between your old system and everything new. Both run independently during the move. When the old part is done, we retire it.

Data first
Sort the data before anything else.

Most migrations fail because nobody sorted the data out first. We plan the data structure and the move before writing a single line of code. So nothing breaks when it matters most.

Move, then improve
In the cloud before the rebuild.

When a full rebuild is not yet the right move, we shift your system to a modern cloud platform first. That cuts your immediate costs and gives your team time to plan the next phase properly.

Case study

A 22-year-old SAP system, migrated in 14 months.

A $1.2B specialty chemicals manufacturer was running their entire billing and operations on a heavily customised SAP system. The previous firm had quoted a $14M, three-year migration. We did it differently.

Fourteen months, two parts moved every two weeks. Orders first, then pricing, then invoicing, then revenue. The old system was retired one section at a time. The business never stopped. No big go-live weekend. No nine-figure invoice.

$9.4M
Saved vs original quote
0
Issues during migration
14 mo
Full migration
Tools of the trade
Migration
  • Step-by-step extraction
  • Parallel running
  • Data sync pipelines
  • Feature flags
Runtime targets
  • Kubernetes
  • Lambda · Cloud Run
  • ECS · Fargate
  • App Service
Data
  • Postgres
  • Aurora
  • DynamoDB
  • Snowflake
  • Kafka
Observability
  • Datadog
  • OpenTelemetry
  • Honeycomb
  • Sentry
Let's talk

Ready to engineer your industrial future?

Tell us what you're building and we'll tell you, honestly, how we'd approach it. We read every message and reply within one business day.